Skip to main content

AS 2665-2001 Smoke/heat venting systems - Design, installation and commissioning

Standards Australia

Version:  Second Edition 2001.  (Current)
error_outline
You are currently viewing a preview version of this resource. Sign in or subscribe for full access.
Publication date
15-11-2001
Pages
23
Current status
Current
Superseded by

Reconfirmed by: AS 2665-2001 Rec:2016 Smoke/heat venting systems - Design, installation and commissioning

Document Number
2665
Description

Specifies requirements for the design, installation and commissioning of a system of sutomatic smoke/heat release vents in conjunction with associated smoke reservoirs in buildings.

Reconfirmed: 2016-05-27

First published as AS2665-1983. Second edition 2001.

Committee

Ventilation and Airconditioning.

Air Conditioning&Mechanical Contractors Association of Australia; Air-Conditioning and Refrigeration Equipment Manufacturers Association of Australia; Australasian Fire Authorities Council; Australian Building Codes Board; Australian Chamber of Commerce and industry; Australian Industry Group; Australian Institute of Building Surveyors; Australian Institute of Refrigeration Air Conditioning and Heating; Chartered Institution of Building Services Engineers; Department of Contract and Management Services, W.A.; Department of Health and Human Services Tasmania; FPA Australia; Institution of Refrigeration Heating and Airconditioning Engineers, New Zealand; Plastics and Chemicals Industries Association; Property Council of Australia; Thermal Insulation Contractors Association of Australia.

ISBN
0 7337 4189 4
Attribution
Standards Australia 2001.
Licence
© All Rights Reserved
NSW
VIC
QLD
NT
WA
ACT
TAS
SA
Sector
Residential
Civil
Commercial
Industrial
AS 2665-2001 Smoke/heat venting systems - Design, installation and commissioning 2001 cover