Skip to main content

AS/NZS 3666.1:2011 Air-handling and water systems of buildings - Microbial control, Part 1: Design, installation and commissioning

Standards Australia/Standards New Zealand

Version:  Third Edition 2011.  (Pending Revision)
error_outline
You are currently viewing a preview version of this resource. Sign in or subscribe for full access.
Publication date
14-11-2011
Pages
28
Current status
Pending Revision
Document Number
3666
Description
Specifies minimum requirements for the design, installation and commissioning of air-handling and water systems of buildings for the purposes of microbial control. It does not include requirements for refrigerated room airconditioners and non-ducted split systems. Originated as part of AS 3666 1989. Previous edition AS/NZS 3666.1:2002. Third edition 2011.
Committee

Ventilation and Airconditioning.

Air Conditioning and Mechanical Contractors Association; Australasian Fire and Emergency Service Authorities Council; Australian Building Codes Board; Australian Institute of Refrigeration Air Conditioning and Heating; Chartered Institution of Building Services Engineers; Climate Control Companies Association; Consumer Electronics Suppliers Association; Department of Health and Human Services, Tas.; Engineers Australia; Facility Management Association of Australia; Institute of Refrigeration Heating&AirConditioning Engineers of New Zealand; NSW Health Department; Plastics and Chemicals Industries Association; Plumbing Industry Commission.

ISBN
978 0 7337 9917
Attribution
Standards Australia/Standards New Zealand 2011.
Licence
© All Rights Reserved
NSW
VIC
QLD
NT
WA
ACT
TAS
SA
Sector
Residential
Civil
Commercial
Industrial
AS/NZS 3666.1:2011 Air-handling and water systems of buildings - Microbial control, Part 1: Design, installation and commissioning 2011 cover