Skip to main content

DES 048 Chiller Schedules

NATSPEC

Version:  2022.  (Current)
error_outline
You are currently viewing a limited version of this resource. Sign in or subscribe for full access.
Publication date
5 October 2022
Pages
2
Current status
Current
Description

NATSPEC worksections cover a wide range of chillers including those with centrifugal, screw or scroll compressors, air or water cooling and heat recovery. Absorption chillers are also included. The chiller worksections also include options for specifying requirements such as IPLV and NPLV. This TECHnote aims to help specifiers to complete the included schedules.

Note that NCC Deemed-to-Satisfy requirements deal with conventional, non-heat recovery duty and make no provision for heat recovery or gas-fired chillers which may have poorer cooling performance but better overall heating-cooling energy efficiency. Rather than using NCC Deemed-to-Satisfy values, these should be handled using NCC performance requirements verified by one of the NCC verification methods e.g. BCA J1V3 Verification using a reference building.

Collections
Volumes
1
Licence
© NATSPEC
NSW
VIC
QLD
NT
WA
ACT
TAS
SA
Sector
Residential
Civil
Commercial
Industrial
NTN_DES_048_Chiller_schedules.pdf 2022. cover