Skip to main content

GEN 012 Door Hardware Scheduling TECHnote

NATSPEC

Version:  (Current)
error_outline
You are currently viewing a limited version of this resource. Sign in or subscribe for full access.
Pages
2
Current status
Current
Document Number
012
Description

This TECHnote outlines the two alternative approaches to specifying door hardware that have been provided for in SELECTIONS in NATSPEC’s 0455 Door hardware worksection: two stage scheduling and proprietary scheduling.

Collections
Licence
© NATSPEC
NSW
VIC
QLD
ACT
SA
WA
NT
TAS
Sector
Residential
Commercial
Civil
Industrial
This TECHnote outlines the two alternative approaches to specifying door hardware that have been provided for in SELECTIONS in NATSPEC’s 0455 Door hardware worksection: two stage scheduling and proprietary scheduling.