Skip to main content

Search all content

21 - 30 of 53 results
AS/NZS 3008.1.1:2017 Electrical installations - Selection of cables, Part 1.1: Cables for alternating voltages up to and including 0.6/1 kV - Typical Australian installation conditions 2017 cover

Publisher
Standards Australia/Standards New Zealand

Version:  Third Edition 2017.  (Current)
Short Description
Sets out a method for cable selection for those types of electrical cables and methods of installation that are in common use at working voltages up to and including 0.6/1 kV at 50 Hz a.c.
AS/NZS 3000:2018 Amd 3:2023 Electrical installations (known as the Australian/New Zealand Wiring Rules) 2023 cover

Publisher
Standards Australia/Standards New Zealand

Version:  Third Edition 2023.  (Current)
Short Description
AS/NZS 3000:2018 is amended as follows.
AS 2118.1:2017 Automatic fire sprinkler systems, Part 1: General systems 2017 cover

Publisher
Standards Australia

Version:  Fourth Edition 2017.  (Current)
Short Description
Specifies general requirements for the design, installation and commissioning of automatic fire sprinkler systems in buildings.
NatHERS Heating and Cooling Load Limits Standard cover 2022

Publisher
Australian Building Codes Board

Version:  2022.  (Latest)
Short Description
NatHERS compliance pathway for energy efficiency.
AS/NZS 2293.1:2018 Emergency lighting and exit signs for buildings, Part 1: System design, installation and operation 2021 cover

Publisher
Standards Australia/Standards New Zealand

Version:  First Edition 2018.  (Current)
Short Description
Specifies requirements for the design and installation of emergency lighting and illuminated emergency exit signage systems for buildings. Central battery, single point and self-contained systems are included.
AS 2419.1:2021 Fire hydrant installations, Part 1: System design, installation and commissioning 2021 cover

Publisher
Standards Australia

Version:  Sixth Edition 2021.  (Current)
Short Description
Specifies requirements for the design, installation and commissioning and testing of fire hydrant installations that are used for the protection of buildings, structures, storage yards, marinas and associated moored vessels, wharves, and plant.
AS/NZS 3019:2022 Electrical installations - Periodic assessment 2022 cover

Publisher
Standards Australia/Standards New Zealand

Version:  Fourth Edition 2022.  (Current)
Short Description
AS/NZS 3019 sets out the requirements for periodic assessment of existing electrical installations which are connected to a low voltage a.c. supply system (exceeding 50 V a.c. but not exceeding 1 000 V a.c.). Inspection and/or testing is intended, as far as reasonably practicable, to determine whether the installation and all its constituent equipment is in a safe condition for continued use.
AS 1768:2021 Lightning protection 2021 cover

Publisher
Standards Australia

Version:  Sixth Edition 2021.  (Current)
Short Description
Specifies requirements for the design, installation, maintenance and testing of lightning protection on common structures, and for electrical and electronic systems within those structures for the protection of people and property from the hazards of lightning.