Skip to main content

AS 4254.2-2012 Ductwork for air-handling systems in buildings, Part 2: Rigid duct

Standards Australia

Version:  First Edition 2012.  (Pending Revision)
error_outline
You are currently viewing a preview version of this resource. Sign in or subscribe for full access.
Publication date
12-11-2012
Pages
92
Current status
Pending Revision
Supersedes

Supersedes: AS 4254-2002 Ductwork for air-handling systems in buildings

Draft Designation: DR AS 4254.2
Document Number
4254
Description

This Standard is Part 2 of a series on ductwork for air-handling systems, as follows:
AS
4254 Ductwork for air-handling systems in buildings
4254.1 Part 1:  Flexible duct
4254.2 Part 2:  Rigid duct

The  terms  ‘normative’  and  ‘informative’  have  been  used  in  this  Standard  to  define  the  
application of the appendix to which they apply. A ‘normative’ appendix is an integral part
of a Standard, whereas an ‘informative’ appendix is only for information and guidance.

Statements expressed in mandatory terms in notes to tables and figures are deemed to be
requirements of this Standard.

Originated as AS 4254-1995. Second edition 2002. AS 4254-2002 revised in part and redesignated as AS 4254.2-2012.

Scope

This Standard specifies requirements for materials, construction, and installation, including
some  aspects  of  performance,  for  ductwork  for  air-handling  systems  in  buildings  and  
facilities, including systems designed in accordance with the requirements of
AS/NZS 1668.1 and AS 1668.2.

Contents:

Section 1: Scope And General
Section 2: Duct Construction And Installation
Section 3: External Equipment Installation
Section 4: Functional Criteria
Appendix A: Procedure For Rating Duct Construction Methods Relative To The Construction Tables  
Appendix B: ‘J’ And ‘I’ Reinforcements Related To ‘Ei’ Values  
Appendix C: Required Loads For Trapeze Angles  
Appendix D: Weights And Areas Of Rectangular Galvanized Steel Ducts  
Appendix E: Weights And Areas Of Circular Galvanized Steel Ducts

Committee

Ventilation and Air conditioning.

Air Conditioning&Mechanical Contractors Association; Australasian Fire and Emergency Service Authorities Council; Australian Building Codes Board; Australian Industry Group; Australian Institute of Refrigeration Air Conditioning and Heating; Chartered Institution of Building Services Engineers; Climate Control Companies Association; Consumer Electronics Suppliers Association; Department of Health and Human Services Tasmania; Engineers Australia; Facility Management Association of Australia; Fire Protection Association Australia; Institute of Refrigeration Heating&Air Conditioning Engineers of New Zealand; Plastics and Chemicals Industries Association; Plumbing Industry Commission; Property Council of Australia.

ISBN
978 1 74342 288 5
Attribution
Standards Australia 2012.
Licence
© All Rights Reserved
NSW
VIC
QLD
NT
WA
ACT
TAS
SA
Sector
Residential
Civil
Commercial
Industrial
AS 4254.2-2012 Ductwork for air-handling systems in buildings, Part 2: Rigid duct 2012 cover