Skip to main content

AS/NZS 3500.3:2015 Plumbing and drainage, Part 3: Stormwater drainage

Standards Australia/Standards New Zealand

Version:  Second Edition 2015.  (Superseded)
error_outline
You are currently viewing a preview version of this resource. Sign in or subscribe for full access.
Publication date
02-03-2015
Pages
188
Current status
Superseded
Supersedes

Supersedes: AS/NZS 3500.3:2003 Plumbing and drainage, Part 3: Stormwater drainage

Draft Designation: DR AS/NZS 3500.3
Document Number
3500
Description

The objective of this Standard is to provide solutions to comply with—

(a) the National Construction Code; and
(b) the Building Code of New Zealand,
for stormwater drainage.

This Standard is part of a series of Standards for plumbing and drainage, as follows:

AS/NZS
3500 Plumbing and drainage
3500.0 Part 0: Glossary of terms
3500.1 Part 1: Water services
3500.2 Part 2: Sanitary plumbing and drainage
3500.3 Part 3: Stormwater drainage (this Standard)
3500.4 Part 4: Heated water services
3500.5 Part 5: Housing Installations

The objective of this revision is to ensure compliance with the ABCB protocol for referenced documents.

This Standard does not cover the criteria for soakers and siphonic systems. Sufficient data was not available in these areas at the time of publication. These areas will be included in a future edition of this Standard, subject to additional research and investigation being carried out.

The terms ‘normative’ and ‘informative’ have been used in this Standard to define the  application of the appendix to which they apply. A ‘normative’ appendix is an integral part of a Standard, whereas an ‘informative’ appendix is only for information and guidance.

Statements expressed in mandatory terms in notes to figures and tables are deemed to be requirements of this Standard.

Notes used in this Standard are of an advisory nature only and are used to give explanation or guidance to the user on recommended considerations or technical procedures, or to provide an informative cross-reference to other documents or publications. Notes to clauses in this Standard do not form a mandatory part for compliance with this Standard.

This document includes commentary on some of the clauses of the Standard. The  commentary directly follows the relevant clause, is designated by ‘C’ preceding the clause number and is printed in italics in a box. The commentary is for information and guidance and does not form part of the Standard.

Some materials and products used in a stormwater drainage system are provided with  instructions for installation and use. Although not a requirement of this Standard or  acceptable as an alternative to the requirements of this Standard, compliance with these  instructions generally ensures that—

(i) the material or product is fit for the application;
(ii) the performance of the system is not degraded;
(iii) the durability of the material or product is not impaired; and
(iv) the manufacturer’s warranty remains valid

First published in part as part of AS CS 3-1931. Revised and redesignated as AS 2179-1978 and AS 2180-1978. AS 2180-1978 and part of AS 2179-1978 revised and designated AS 2180-1986. AS 3500.3 first published 1990. AS 2180-1986 and AS 3500.3-1990 jointly revised, amalgamated and redesignated in part as AS 3500.3.1-1998 and AS/NZS 3500.3.2:1998. AS 3500.3.1-1998 and AS/NZS 3500.3.2:1998 jointly revised and redesignated as AS/NZS 3500.3:2003.

Scope

This  Standard  sets  out  requirements  for  materials,  design,  installation  and  testing  of  roof  drainage  systems,  surface  drainage  systems  and  subsoil  drainage  systems  to  a  point  of  connection.

Contents:

Section 1: Scope And General
Section 2: Materials And Products
Section 3: Roof Drainage Systems—Design
Section 4: Roof Drainage Systems—Installation
Section 5: Surface Drainage Systems—Design
Section 6: Surface And Subsoil Drainage Systems—Installation
Section 7: Surface And Subsoil Drainage Systems—Ancillaries
Section 8: Pumped Systems
Section 9: Site Testing
Appendix A: Normative References  94
Appendix B: Site-Mixed Concrete For Minor Works   
Appendix C: Stormwater Drainage Installation Plans   
Appendix D: Guidelines For Determining Rainfall Intensities  
Appendix E: Rainfall Intensities For Australia—5 Minutes Duration   
Appendix F: Rainfall Intensities For New Zealand—10 Minutes Duration  
Appendix G: Examples Of Overflow Measures For Eaves Gutters  
Appendix H: General Method For Design Of Eaves Gutter Systems—Example  
Appendix I: Box Gutter Systems—General Method, Design Graphs And Illustrations  
Appendix J: Box Gutter Systems—General Method—Examples   
Appendix K: Surface Drainage Systems—Nominal And General Methods—Examples  
Appendix L: Example Calculation—Pumped System  
Appendix M: Subsoil Drainage Systems—Design  Appendix N: General Information

Committee

National Plumbing And Drainage Code.

Association of Hydraulic Services Consultants Australia; Australian Building Codes Board; Australian Industry Group; Building Officials Institute of New Zealand; Gas Appliance Manufacturers Association of Australia; Institute of Plumbing Australia; International Copper Association of Australia; Master Plumbers Australia; National Fire Industry Association; Plastics Industry Pipe Association of Australia; Plastics New Zealand; Plumbing Products Industry Group; Water New Zealand.

ISBN
978 1 74342 995 2
Attribution
Standards Australia/Standards New Zealand 2015.
Licence
© All Rights Reserved
NSW
VIC
QLD
ACT
SA
WA
NT
TAS
Sector
Residential
Commercial
Civil
Industrial
AS/NZS 3500.3:2015 Plumbing and drainage, Part 3: Stormwater drainage 2015 cover