Skip to main content

Search all content

1 - 10 of 100 results
AS 11801.6:2019 Information technology - Generic cabling for customer premises, Part 6: Distributed building services (ISO/IEC 11801-6:2017, MOD) 2019 cover

Publisher
Standards Australia

Version:  First Edition 2019.  (Current)
Short Description
The objective of this Standard specifies generic cabling within premises that comprise single or multiple buildings on a campus; it covers balanced cabling and optical fibre cabling.
AS 11801.2:2019 Information technology - Generic cabling for customer premises, Part 2: Office premises (ISO/IEC 11801-2:2017, MOD) 2020 cover

Publisher
Standards Australia

Version:  First Edition 2019.  (Current)
Short Description
The objective of this Standard is to specify generic cabling for use within office premises, which can comprise single or multiple buildings on a campus; covers balanced cabling and optical fibre cabling.
NTN_DES_048_Chiller_schedules.pdf 2022. cover

Publisher
NATSPEC

Version:  2022.  (Current)
Short Description
NATSPEC worksections cover a wide range of chillers including those with centrifugal, screw or scroll compressors, air or water cooling and heat recovery. Absorption chillers are also included; the chiller worksections also include options for specifying requirements such as IPLV and NPLV; this TECHnote aims to help specifiers to complete the included schedules.
NTN_DES_047_Specifying_air_filters.pdf 2022. cover

Publisher
NATSPEC

Version:  2022.  (Current)
Short Description
Discusses options for specifying particulate air filters for air conditioning and ventilation.
NTN_GEN_033_Understanding_two_part_specifications.pdf 2022. cover

Publisher
NATSPEC

Version:  2022.  (Current)
Short Description
NATSPEC produces a range of specification worksection templates which include technical and quality requirements for most building types.
DIGITAL ARCHIVING: FILE NAMING AND PROJECT FOLDER STRUCTURE

Publisher
NATSPEC

Version:  (Current)
Short Description
Develop simple and flexible guiding principles that work within the context of the practice.
Using NATSPEC Selections Schedules TECHnote cover 2021

Publisher
NATSPEC

Version:  2021  (Current)
Short Description
Schedules summarise information about a related group of items in a tabular form, in NATSPEC, they are used to document a selection of products or systems by their distinguishing characteristics or properties.
Sprayed Preservation Surfacing Treatments TECHnote 2021

Publisher
NATSPEC

Version:  2021.  (Current)
Short Description
The objective of this TECHnote is to assist road owners to determine when and where to apply the most appropriate sprayed preservation surfacing to obtain the maximum benefit to their sealed road network.
The objective of this TECHnote is to increase road owners’ understanding of the feasibility of using Otta seal for low traffic volume unsealed gravel roads.

Publisher
NATSPEC

Version:  (Current)
Short Description
The objective of this TECHnote is to increase road owners’ understanding of the feasibility of using Otta seal for low traffic volume unsealed gravel roads.