Skip to main content

Search all content

1 - 10 of 104 results
HBCF Complaint and Dispute Handling Procedures cover 2021

Publisher
Insurance & Care NSW (icare)

Version:  7th edition, 2021.  (Current)
Short Description
This document has been prepared by icare HBCF: Insurance and Care NSW (icare) provides services in the administration of the Home Building Compensation Fund for the NSW Self Insurance Corporation.
HBCF Eligibility Manual cover 2021

Publisher
Insurance & Care NSW (icare)

Version:  10th edition, 2021.  (Current)
Short Description
The material in this document is to provide guidance to icare distributors, builders, and builder advisors as a key reference source for applying for and maintaining eligibility under the Home Building Compensation Fund (HBCF).
Policy of Insurance under Part 6 of the Home Building Act 1989 (NSW) cover 2018

Publisher
Insurance & Care NSW (icare)

Version:  Fourth edition, 2018.  (Latest)
Short Description
Policy of insurance.
Cutting and Drilling Concrete and other Masonry Products 1997 cover

Publisher
WorkCover NSW

Version:  1997.  (Current)
Short Description
Sets out guidelines for the use of saws and drills and associated equipment in the cutting and drilling of concrete and other building structural materials during construction work.
Overhead Protective Structures 1995 cover

Publisher
WorkCover NSW

Version:  1995.  (Current)
Short Description
Provides practical guidance and set minimum safety standards for all overhead protective structures in New South Wales.
  Safe Work On Roofs. Part 1: Commercial And Industrial Buildings 2009 cover

Publisher
WorkCover NSW

Version:  2009.  (Current)
Short Description
Provides clients, employers, self-employed persons, contractors, subcontractors and workers with practical advice on preventing injury to persons engaged in work on roofs.
Tunnels Under Construction 1991 cover

Publisher
WorkCover NSW

Version:  1991.  (Current)
Short Description
Explains the processes involved in the systematic management of OHS risks and outlines how to apply a risk management approach to the hazards commonly encountered in tunnel construction in NSW.
NTN_DES_048_Chiller_schedules.pdf 2022. cover

Publisher
NATSPEC

Version:  2022.  (Current)
Short Description
NATSPEC worksections cover a wide range of chillers including those with centrifugal, screw or scroll compressors, air or water cooling and heat recovery. Absorption chillers are also included; the chiller worksections also include options for specifying requirements such as IPLV and NPLV; this TECHnote aims to help specifiers to complete the included schedules.
NTN_DES_047_Specifying_air_filters.pdf 2022. cover

Publisher
NATSPEC

Version:  2022.  (Current)
Short Description
Discusses options for specifying particulate air filters for air conditioning and ventilation.
NTN_GEN_033_Understanding_two_part_specifications.pdf 2022. cover

Publisher
NATSPEC

Version:  2022.  (Current)
Short Description
NATSPEC produces a range of specification worksection templates which include technical and quality requirements for most building types.